logo com4

Construction Of Ball Mill Foundations

Hire an experienced design and build contactor that has a proven track record with precision machine tool foundations.If the foundation is a below floor design with a metal surround deck make sure to leave a sufficient gap between the deck and the machine base.They should never touch as this can cause problems with leveling and alignment.

Copyright © 2020 Henan Mining Machinery Co., ltd. All rights reserved.Sitemap