logo com4

Cement Mill In Side

Sidetracking guidelines.Sidetracking from a cement plug - a new bit of the same type used to drill the original wellbore should be used.Once the window is milled and the mwd is 15-20m out side and away from the casing the mwd begins to function normally and the gyro can then be pulled and normal drilling operations can continue.

Copyright © 2020 Henan Mining Machinery Co., ltd. All rights reserved.Sitemap